UPL 34112
IMAGE"ENGINE ASSEMBLY-REPAIR BASE HIT: As smoke and fire spill away from hits on hangars and workshops on one end of the Engine assembly and repair base at Clermont-Ferrand in south central France during the 8th AF heavy bomber attack of April 30 1944 other hits are registered on buildings in another portion of the field."