41-2496

Delivered Patterson 15/1/42; Wright 1/3/42; Minneapolis 14/3/42; Wright 10/6/42; Patterson 17/6/42; Biggs 15/5/43; 2511 BU Bryan 5/12/43; Reconstruction Finance Corporation (sold for scrap metal in USA) Walnut Ridge 5/10/45.

Revisions

Date
Contributorjmoore43
Changes
Sources

Added the Production block number and Manufacturer per info on the internet.
SOURCE: //b17flyingfortress.de/en/production-block/boeing-b-17e-41-2393-41-2669/page/2/

Date
ContributorAAM
Changes
Sources

Dave Osborne, B-17 Fortress Master Log