41-2477

Delivered Sacramento 29/12/43; Langley 3/1/42; Assigned 7BG Hawaii (Project X) 14/1/42; Returned to the USA Tyndall 12/11/43, converted to RB-17Q; Atlanta 6/10/44; Rome 12/12/44; Reconstruction Finance Corporation (sold for scrap metal in USA) Walnut Ridge 8/1/46.

Revisions

Date
Contributorjmoore43
Changes
Sources

Added the Production block number and Manufacturer per info on the internet.
SOURCE: https://b17flyingfortress.de/en/production-block/b-17e/page/5/

Date
ContributorAAM
Changes
Sources

Dave Osborne, B-17 Fortress Master Log